Friday, January 21, 2011

Construction Update 1/21/2011

It was a bright, brisk day a the Bay Beach Zippin Pippin Roller Coaster. With temperatures in the single digits and the wind chill below zero it was cold but the sun made for some good pictures. I took three panoramas, one looking north at zone 1 and 2.

From Zippin Pippin Construction

One looking north showing the entire roller coaster.

From Zippin Pippin Construction

And one looking east.

From Zippin Pippin Construction

Moving on to some more detailed areas effort remains focused on the lift hill area. Chain trays have been added between the lift house and the sprocket at the bottom of the lift hill and a chain tray is being added to the lift hill.

From Zippin Pippin Construction
From Zippin Pippin Construction
From Zippin Pippin Construction

From the bottom of the lift hill you can see the steel track now goes up and over the top of the lift hill.

From Zippin Pippin Construction

From inside and outside the oval you can see the steel goes up to turn #2, the turn right after the lift hill.

From Zippin Pippin Construction
From Zippin Pippin Construction

Back at the bottom of the lift hill you can see they are building stairs alongside the lift hill track.

From Zippin Pippin Construction

Just north of the lift hill is the transfer station, the decking on the transfer station is now complete.

From Zippin Pippin Construction

The wooden track is now being extended into zone 3, in this view you can see the track leaving the oval of zone 1 and 2.

From Zippin Pippin Construction

It continues over the first hill in zone 3...

From Zippin Pippin Construction

...and over the second hill of zone 3...

From Zippin Pippin Construction

...stopping at the bottom of the second hill, just short of the turn around.

From Zippin Pippin Construction

Back in the staging area outside of the oval there are a couple of things worth noting. First check out the section bender they use to put curves into the strips of steel for track that goes around turns.

From Zippin Pippin Construction
From Zippin Pippin Construction

There is also a pallet full of the plastic strips that are being added to the bottom of the chain trays to reduce friction.

From Zippin Pippin Construction

And some white piping that appears to be hand rails, possible for the loading platform.

From Zippin Pippin Construction

Even with the frigid temperatures at the second half of this week the overall project seems to be ahead of schedule. Be sure to check back next week for another update.